Golf Course Renovation | Tee Construction

Tee renovation is an important process for golf course renovation and many factors are taken into consideration during this work. The surfaces must be positioned to aim toward the center of the golf hole to allow for surface water runoff, while providing a comfortable stance for the golfer.

Depending on the existing soil: sandy, clay, or rock; the architect may choose a modified tee surface that includes 4” to 6” of greensmix material. In some cases, subsurface drainage is installed.

  • Qualified and experienced tee installation crews
  • Understands the visual importance of tee design
  • Performs quality work in a timely and
    professional manner

const08

Picture caption CLOSE